Rki-instruments M2 Rig Monitor Manual de usuario Pagina 15

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 53
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 14
M2 Rig Monitor Operator’s Manual 10
Chapter 3: Installation & Startup
Overview
This chapter describes procedures to mount the M2 Rig Monitor in the monitoring
environment and wire it to input power and devices.
Mounting the M2 Rig Monitor
Perform the following procedure to install the instrument housing at the mounting site.
Figure 6: Rig Monitor Outline and Mounting Dimensions
1. Select a mounting site that is representative of the monitoring environment. Consider
the following when you select the mounting site.
Select a site where the Rig Monitor is not likely to be bumped or disturbed. Make
sure there is sufficient room to perform start-up, maintenance, and calibration
procedures.
Is a DC power source available?
9.62
3.43
1.5 max
6.8 max
2.75
6.89
13.50
6.56
1.1
6.1
Ø .25 Mouting Holes (2X)
5.46
Vista de pagina 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 52 53

Comentarios a estos manuales

Sin comentarios