Rki-instruments SDM-2012 PC Controlled Configuration Manual de usuario Pagina 109

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 218
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 108
Calibrating a Gas Tracer 104
15. After air is applied, and if the ppm sensor passed the zero adjustment,
calibration gas from the GAS 2 cylinder will be applied to the ppm sensor. The
GAS 2 indicator on the program screen will come on and calibration gas will be
applied to the ppm sensor for 90 seconds.
Figure 82: GAS 2 PPM Gas Flowing
The PC Controller program will analyze the results.
Vista de pagina 108
1 2 ... 104 105 106 107 108 109 110 111 112 113 114 ... 217 218

Comentarios a estos manuales

Sin comentarios