Rki-instruments SDM-2012 PC Controlled Configuration Manual de usuario Pagina 92

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 218
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 91
87 • Bump Testing a Gas Tracer
17. After calibration gas has been applied to the ppm sensor, fresh air will be
applied to the standard 3 sensors (catalytic LEL, O
2
, and CO) and the
%volume sensor (if installed) for 45 seconds and the PC Controller program
will perform a zero adjustment.
Figure 67: Air Flowing to Standard 3 Sensors
The PC Controller Program will analyze the zero adjustment results. If any of
the standard 3 sensors or %volume sensor (if installed) failed the zero
adjustment, the bump test will be aborted.
Vista de pagina 91
1 2 ... 87 88 89 90 91 92 93 94 95 96 97 ... 217 218

Comentarios a estos manuales

Sin comentarios